Dubai Frame, United Arab Emirates

Dubai Frame, United Arab Emirates: The customized climbing formwork solution combined three different ACS self-climbing versions with VARIO Girder Wall Formwork and TRIO Panel Formwork.
Dubai Frame, United Arab Emirates
Dubai Frame, United Arab Emirates: The climbing units, consisting of wall formwork and platforms, were moved from storey to storey using an integrated hydraulic system.
Dubai Frame, United Arab Emirates: The planned exhibition area covered the complete 90 m width between the two towers. The 24 inclined columns, each 7 m high, were formed with VARIO GT 24. PERI UP Modular Scaffolding was used as shoring for the MULTIFLEX Slab Formwork as well as access scaffold.

Project data

Location: Dubai, United Arab Emirates

  • Extraordinary landmark structure in the form of a 155 m high and 93 m wide picture frame
  • Complex, slender shapes of the towers with angular geometries
  • 75 m wide, self-supporting steel bridge construction connecting both towers

Requirements

  • Complex shape of the “rising profile of the frame” with trapezoidal-shaped, extremely slender ground plan
  • Up to 10 m storey heights with angular geometries and confined space
  • High loads and massive dimensions in the transition areas between the towers and skybridge
  • Low dimensional tolerances

 

Customer

Al Rostamani Pegel L.L.C. (ARP)

Customer's benefit

  • Crane-indepenedent climbing in regular 3½-day cyclessaved a total of 30 working days
  • Generously-sized working platforms and integrated access technology created valuable work spaces and ensured a high level of safety
  • Continuous on-site support through the PERI project team
  • Efficient working processes resulting in increased productivity

 

Picture of Tobias Heilig, Project Manager / Al Rostamani Pegel L.L.C. (ARP)
Tobias Heilig
Project Manager

With PERI, we have already realized numerous projects and know the high-end solutions as well as the high standard of service. For this project, the complexity of the building´s structure was initially easy to underestimate but we were always supported on-site whenever needed. In the end, we could climb in 3½-day cycles thus saving a total of 30 days construction time.

PERI solution

  • Optimized project-specific climbing formwork solution
  • Three different ACS self-climbing versions with VARIO Girder Wall Formwork and TRIO Panel Formwork
  • Combination of elevated and suspended platforms
  • Integrated hydraulic cylinders, each with 100 kN lifting force, provided a crane-independent and safe climbing procedure
  • Customized formwork solution in the transition areas of the 2,100 t steel bridge construction
  • Fast and efficient on-site support provided by the PERI project team for handling the complex construction tasks